Step no. 1 is to purchase land.
Step no. 2 is to do an architectural drawing.
Step no. 3 is to do a structural drawing.
Step no. 4 is to get governmental approvals.
Step no. 5 is to get water and electrical connections
Step no. 6 is to mobilize and start construction